Demolition Contractors


Most demolition permits now require a licensed asbestos inspection to certify that either there is no asbestos present or a lab report listing the asbestos materials found and a sign off by a Illinois Department of Public Health licensed asbestos contractor that the asbestos building materials have been removed.

Pre Demolition inspections are offered at competitive rates. Written results typically are given within 3 working days.